Sebanyak 43 item atau buku ditemukan

Report of the Minnesota Attorney General's Arson Task Force

Presents the results of a comprehensive review of the crime of arson in the State of Minnesota, along with recommendations for reducing the incidence of arson and improving efforts to identify perpetrators. Contains an overview of the problem of arson and factors contributing to its incidence. A summary of recommendations includes personnel and cost requirements for each proposed strategy. Appendices include data on 1991-1995 incendiary trends in the state, juvenile firesetting data, and Minnesota arson statutes.

Other Specific Recommendations Were as Follows: • Obtain a commitment for the
Minnesota Arson Strike Force from policymakers. • Obtain a multiple-agency
member commitment. • Develop a workable protocol and memorandum of ...

Task Force on Sexual Predators

Final Report to the Minnesota Legislature

I8 CTVIL COMMITMENT ACT 296 Subd. 2. Review, hearing. A written treatment
report shall be filed with the committing court within 60 days after commitment. If
the person is in the custody of the commissioner of corrections when the initial ...

Report of the National Task Force on Criminal History Record Disposition Reporting

Strategies for improving disposition reporting.

... (5) The presentment of an indictment or the filing of a criminal information or
other statement of charges; (6) A release on bail or other conditions pending trial
or appeal; (7) A commitment to or release from a place of pretrial confinement; ...

Report of the Defense Science Board Task Force on Joint Advanced Strike Technology (JAST) Program

The Joint Advanced Strike Technology (JAST) resulted from the decisions of the Secretary of Defense' Bottom Up Review (BUR). Each service has a demonstrated need for advanced technology aircraft to meet future contingencies, but it was determined that costs for development and production of these several different aircraft could not be met due to budgetary constraints. The BUR found that there were not enough resources available to support all these programs in future years. The decision was made to continue with the Air Force F-22 fighter aircraft, and the F/A-18E/F aircraft for the Navy, but to cancel the A/F-X and the MRF. The decision on ASTOL was to continue that research, but to secure specific commitment of resources by at least two of the three Services before building a flying prototype.The BUR also confirmed the continuing needs that were to be met by the A/F-X and MRF programs. This led to the establishment of the Joint Advanced Strike Technology Program in July 1993.

DoD cannot guarantee Congressional commitment but can increase the
probability that, once into EMD, DoD commitment is for the life of the program.
Once entered into EMD, decisions impacting program flow should be by
exception.

Federal Task Force on the Boston Central Artery Tunnel Project

Review of Project Oversight and Costs

The Central Artery/Tunnel (CA/T) Project in Boston, MA, is the largest federally funded public works project in recent history, involving the reconstruction of I-93 and the extension of I-90. The CA/T Project is approx, 7.5 miles long and includes approx. 160 lane-miles of new and reconstructed highway. The majority of the CA/T Project is below ground. More Fed. funding ¿ $5.8 billion and growing ¿ has been allocated to the CA/T Project than to any other construction project of its kind. Contents of this review conducted in 2000: Objectives: Assess the Oversight Process; Review the Management Structure; Validate the $1.4 Billion Potential Cost Overrun; Identify Potential New Cost Indicators; Identify Potential Cost Saving Measures. Charts and tables.

Although the Plan indicates the State is committed to a balanced statewide
transportation program, the basis for this commitment appears to be State internal
policy without a binding agreement. This commitment has two parts. First, the
State ...

Number, Timing, and Duration of Marriages and Divorces: 2001

Household Economic Statistics

Provides info. on marital indicators in 2001. Describes changes in the age at which different cohorts of men & women born since 1935-1939 have married, divorced, & remarried. Provides current indicators of the percentage of the population who have married more than once, who have ever divorced, or who experienced other marital events. Answers questions about how long first marriages last, the median age at which people marry or divorce, & what percentage of currently married couples involve spouses who are both in their first marriages. Profiles the characteristics of people who experienced a marital event in the year prior to the survey. Considers the relationships between whether people remarry after a divorce & the number of children born to them. Ill.

Farmersville city, Collin County First Colony CDF, Fort Bend County.. Floresville
city, Wilson County Flower Mound town Denton County Tarrant County Floydada
city, Floyd County Forest Hill city, Tarrant County Forney town, Kaufman County ...

Comparison of two approaches for determining ground-water discharge and pumpage in the lower Arkansas River basin, Colorado, 1997-98

Estimates of mean differences in pumpage between power conversion coefficient
approach and totalizing flowmeter for the grand mean and fixed effects of method
, make, and type [NS, mean is not significantly different from zero at the ...

Revised assessment of detection and quantitation approaches

5.2.1.2.2 Criterion 2: The approach should address realistic expectations of
laboratory and method performance, including routine variability. The ML
procedure meets this criterion. It is designed to provide a means by which a
laboratory can ...

Influenza Pandemic: Further Efforts Are Needed to Ensure Clearer Federal Leadership Roles and an Effective National Strategy

The administration has taken an active approach to this potential disaster by
developing a Strategy and Plan and has taken a number of other actions. These
include establishing an information clearinghouse for pandemic information; ...

Microelectronics research & development : background paper.

Chapter 3 Current Research and Development Activity ADVANCED SILICON
INTEGRATED. ily more capital-intensive, since every technological advance
demands more complex equipment and production facilities. The high cost of
capital ...